客戶(hù)在購買(mǎi)攪拌機后,都要先空載試運轉一下,看看攪拌機是否可以正常運轉,才能正式使用,但是在試運轉時(shí)也需要注意很多注意事項,小編給您總結了以下幾點(diǎn)。
After the customer purchases the mixer, they all need to have a no-load test run to see if the mixer can operate normally before it can be used formally. However, they also need to pay attention to a lot of precautions during the test run. The editor summarizes the following points for you.
攪拌機空載試運轉注意事項:
Precautions for no-load commissioning of mixer:
1、混凝土攪拌機電動(dòng)機應運動(dòng)試驗,觀(guān)察是否正常。
1. The motor of concrete mixer should be tested first to see if it is normal.
2、啟動(dòng)攪拌電動(dòng)機,皮帶的旋轉方向應與標注的尖頭方向一致,若方向不一致時(shí),應改變電流接線(xiàn)。
2. When starting the mixing motor, the rotation direction of the belt should be consistent with the marked tip direction. If the direction is inconsistent, the current wiring should be changed.
3、啟動(dòng)卷?yè)P電動(dòng)機的提升料斗時(shí),要檢查料斗升降過(guò)程以及上、下限位是否可靠。
3. When starting the lifting hopper of the winch motor, it is necessary to check the lifting process of the hopper and whether the upper and lower limits are reliable.
4、啟動(dòng)卸料裝置,卸料門(mén)開(kāi)閉應要保持準確到位。
4. When the unloading device is started, the opening and closing of the unloading door should be kept in place.
5、點(diǎn)動(dòng)水泵電動(dòng)機,檢查旋轉方向。
5. Jog the pump motor and check the rotation direction.
6、擰開(kāi)水泵加水螺塞灌入引水時(shí),要使水充滿(mǎn)泵腔以及進(jìn)水管,直能吸水為止,然后再把加水螺塞擰緊。
6. Screw on the water plug of the water pump to fill the pump cavity and the water inlet pipe until it can absorb water, and then tighten the water plug.
很多用戶(hù)在對剛購買(mǎi)回來(lái)的攪拌一體機都是直接使用,根本不去檢查,也不注意對于新機攪拌機試運機的重要性,大多數攪拌一體機操作用戾都覺(jué)的檢查太麻煩。用戶(hù)的這種想法是不對了。對于新機試用前的準備工作也是每一個(gè)操作使用混凝土攪拌機的工作人員都不可忽視的。檢查并不是一件麻煩的事,檢查是為了減少更多的麻煩所必須的工作。
Many users just bought back in the mixing machine are directly used, simply do not check, also do not pay attention to the importance of the new machine mixer trial run machine, most of the mixing machine operation with Li feel that the inspection is too troublesome. The user's idea is wrong. For the new machine before the trial preparation work is also every operation of the use of concrete mixer staff can not be ignored. Inspection is not a troublesome thing. Inspection is a necessary work to reduce more troubles.